Sarawak Energy Berhad
Design, Engineering, Supply, Erect and Commissioning of New Bintulu B 275/(132)kV Substation Establishment (PLS-140106).
Design, Engineering, Supply, Erect and Commissioning of New Bintulu B 275/(132)kV Substation Establishment (PLS-140106).
Calamba 230kV Substation Project – Design, Supply, Installation, Testing & Commissioning of Secondary Devices Including Construction/ Erection/Integration of NGCP Supplied High Voltage Equipment (Sp17.CSSP.Lt-0312).
Development of 115kV Siem Reap - Oddor Meanchey Transmission Line and 115/22kV Oddor Meanchey Substation and 230/22kV Bek Chan (Porsenchey) Substation Project in Cambodia.
Complete Hydro Turbine Control inclusive of:
High Pressure Hydraulic System Replacement.
Turbine Governor Replacement.
Project Management, Engineering, Dismantling of Existing System, Installation and Testing & Commissioning.
Plant Information Management System.
Complete Upgrading of DCS for CCP Boiler, Steam Turbine and GT Interface Using Latest Control System from Valmet DNA DCS System, inclusive of Project Management, Supply, Design, Engineering, Assembly, Testing, Installation and Commissioning.
Establishment of Power Plant Generator Excitation System at Lumut.
Complete Turbine Control & Governor Electrical System inclusive of:
Complete Upgrade of Existing GT HMI Hardware, inclusive of Supply, Design, Engineering, Installation, Testing and Commissioning.
Relocation of GE Gas Turbine GTM LM2500 from Melawa to Batu Sapi Power Plant.