Sarawak Energy Berhad
Design, Engineering, Supply, Erect and Commissioning of Samajaya GIS 132/33/11kV Substation Establishment.
Design, Engineering, Supply, Erect and Commissioning of Samajaya GIS 132/33/11kV Substation Establishment.
Engineering, Procurement and Construction, Commissioning & Testing and the Handing Over and Providing Defect Liability Coverage of 18 months for a New 132/33kV Substation.
Project for the Upgrading of Existing 132/11kV Main Intake Substation (Mainhead A) and The Design, Supply, Delivery, Installation, Testing & Commissioning, Putting Into Operation and Maintenance for a Period of 24 Months of 132kV Switchgear, Associated Equipment and Systems for 132/11kV Ulu Kali Main Intake Substation at HS (D) 2043, PT 2079, Mukim Bentong, Daerah Bentong, Pahang Darul Makmur (Mainhead B), Malaysia.
Project for the Upgrading of Existing 132/11kV Main Intake Substation (Mainhead A) and The Design, Supply, Delivery, Installation, Testing & Commissioning, Putting Into Operation and Maintenance for a Period of 24 Months of 132kV Switchgear, Associated Equipment and Systems for 132/11kV Ulu Kali Main Intake Substation at HS (D) 2043, PT 2079, Mukim Bentong, Daerah Bentong, Pahang Darul Makmur (Mainhead B), Malaysia.
Design, Engineering, Supply, Erect and Commissioning of Extension of 2 x 132kV OHL Bays at PMU Kampung Awah and Associated Works at PMU Kampung Awah and PMU Jengka, Pahang, Malaysia.
Design, Supply and Installation of 3 Substations for JSC “Severelectro” IDA-ESARIP-ICB-CW-2014-1 under Electricity Supply Accountability and Reliability Improvement Project (ESARIP) (Bishkek 110/35/6kV, Orto-Say 35/6-10kV and Sport 35/6- 10kV), Kyrgyzstan.
Design, Supply and Installation of 3 Substations for JSC “Severelectro” IDA-ESARIP-ICB-CW-2014-1 under Electricity Supply Accountability and Reliability Improvement Project (ESARIP) (Bishkek 110/35/6kV, Orto-Say 35/6-10kV and Sport 35/6- 10kV), Kyrgyzstan.
Establishment of PMU 132/33kV MRT Jinjang GIS (2x90MVA) and 132kV Overhead Line (KULE-KLJT/ BCVS) Loop-In/Loop-Out Into PMU MRT Jinjang & 132kV Underground Cable from PMU MRT Jinjang to Bulk MRT Jinjang Switching Station, Malaysia.
Design, Engineering, Supply, Erect and Commissioning of Sibiyu 132/33kV GIS Substation Project (Contract No.: PLS-150129).
Design, Engineering, Supply, Erect and Commissioning of 132kV and 11kV Switchgears, 30MVA 132/11kV Power Transformer and Ancillary Equipment with Associated Civil Works for Rehabilitation of PMU 132/11kV Perak Carbide.