Tenaga Poly Sdn Bhd

Submitted by oswebmaster on Fri, 04/24/2020 - 15:30

Project for the Upgrading of Existing 132/11kV Main Intake Substation (Mainhead A) and The Design, Supply, Delivery, Installation, Testing & Commissioning, Putting Into Operation and Maintenance for a Period of 24 Months of 132kV Switchgear, Associated Equipment and Systems for 132/11kV Ulu Kali Main Intake Substation at HS (D) 2043, PT 2079, Mukim Bentong, Daerah Bentong, Pahang Darul Makmur (Mainhead B), Malaysia.

Tenaga Poly Sdn Bhd

Submitted by oswebmaster on Fri, 04/24/2020 - 15:30

Project for the Upgrading of Existing 132/11kV Main Intake Substation (Mainhead A) and The Design, Supply, Delivery, Installation, Testing & Commissioning, Putting Into Operation and Maintenance for a Period of 24 Months of 132kV Switchgear, Associated Equipment and Systems for 132/11kV Ulu Kali Main Intake Substation at HS (D) 2043, PT 2079, Mukim Bentong, Daerah Bentong, Pahang Darul Makmur (Mainhead B), Malaysia.

Tenaga Nasional Berhad

Submitted by oswebmaster on Fri, 04/24/2020 - 15:30

Establishment of PMU 132/33kV MRT Jinjang GIS (2x90MVA) and 132kV Overhead Line (KULE-KLJT/ BCVS) Loop-In/Loop-Out Into PMU MRT Jinjang & 132kV Underground Cable from PMU MRT Jinjang to Bulk MRT Jinjang Switching Station, Malaysia.

Tenaga Nasional Berhad

Submitted by oswebmaster on Fri, 04/24/2020 - 15:29

Design, Engineering, Supply, Erect and Commissioning of 132kV and 11kV Switchgears, 30MVA 132/11kV Power Transformer and Ancillary Equipment with Associated Civil Works for Rehabilitation of PMU 132/11kV Perak Carbide.