ABB Transmission & Distribution Sdn Bhd
Installation & Commissioning of 33kV Gas Insulated Switchgear & 11kV Switchgear for TNB PPU Substation in Northern Region.
Installation & Commissioning of 33kV Gas Insulated Switchgear & 11kV Switchgear for TNB PPU Substation in Northern Region.
Design, Engineering, Supply, Manufacturing, Delivery, Installation of 132kV, 33kV, 11kV of Remote Control Panel & Protection Panel, NER and Laying Cable for PMU 132/33/11kV Bidor Substation, Perak.
Design, Engineering, Supply and Manufacture of 132kV Control Relay Protection Panels, NER, Outdoor Junction Box and Distribution Board for GIS Huntsman Tioxide Project, Kemaman, Terengganu.
Design, Engineering, Supply, Manufacture, Test and Deliver of 132kV Secondary Switchyard, 132/33/11kV Control and Relay Panels, RTU, 11kV Switchgear, 11/33kV NER System for Tanjung Langsat 132/33/11kV Substation Extension.
Design, Engineering, Supply, Construct, Testing and Commissioning a Single Feeder AIS 132kV Substation for MNI.
Installation of 33kV and 11kV Switchgear Control Relay Panel and Its Ancillary Equipment for TNB Northern Region PPU 33/11kV Substation.
Laying, Termination of Power and Control Cable for Amsteel Plant in Shah Alam.
Termination & Laying of 132kV Cable for 132kV Power Transformer at Kampung Awah Substation.
Design, Engineering, Supply, Deliver, Install, Test and Commission for Plant Life Extension and Automation of Cameron Highlands & Batang Padang Hydroelectric Schemes – Switchyard Portion (132/11kV Transmission Equipment) for PMU 132/11kV Jor and Woh Substations.
Design, Engineering, Supply, Erect, Testing and Commissioning of 132kV Switchgears, Ancillary Equipment and Associated Civil Works at Existing Kuala Ketil, Gutherie and Bedong 132kV Substations.