Tenaga Nasional Berhad
Turnkey Project Inclusive of Design, Manufacture, Supply, Erect and Commission Approximately 5050 route meter of 275kV Double Circuit Cable from PMU Ampang to Proposed PMU Prince Court, Selangor, Malaysia.
Turnkey Project Inclusive of Design, Manufacture, Supply, Erect and Commission Approximately 5050 route meter of 275kV Double Circuit Cable from PMU Ampang to Proposed PMU Prince Court, Selangor, Malaysia.
Turnkey Project Inclusive of Design, Engineering, Supply, Erect and Commissioning of 275kV XLPE Power Cable (Transformer Trail) for Super Grid Transformers and 33kV XLPE Power Cables System for PMU 500/275kV Junjung, Kedah, Malaysia.
Supply, Delivery of 7 RTU for Substation & Power Station with IEC870-5-101 Protocol, Integrating into Siemens Spectrum Load Control Center.
Installation and Commissioning of RTU at PMU Bandar Melaka and PMU Gong Badak, Terengganu.
Installation and Commissioning of RTU at PMU Perling, Gerisek, Europlus Zone 1 (Tanjung Agas) and Bukit Merah.
Design, Engineering, Supply, Manufacture, Testing and Commissioning Generator RTU at Telok Gong/ Panglima Power Station.
Installation and Commissioning of RTU at PMU Jalan Nyior, Johor.
Installation and Commissioning of RTU at PMU Bukit Selambau and Other Ancillary Accessories.
Installation and Commissioning of RTU at PMU Bukit Kemuning 132/11kV, Selangor.
Design, Engineering, Supply, Manufacture, Testing and Commissioning RTU at Prime Minister Office (PMO), Prime Minister Resident (PMR) and Deputy Prime Minister Office (DPMO) Substations.