Zafas Sdn Bhd
Line Diversion Works with Include Supply and Install and Auxillary Cross Arm.
Line Diversion Works with Include Supply and Install and Auxillary Cross Arm.
Line Diversion Works with Include Supply and Install and Auxillary Cross Arm.
Supply and Delivery of 132kV Tower Lightning Surge Arrestor for Asset Maintenance, Transmission Division.
Supply, Stringing and Commissioning of Double Circuit of 132kV Overhead Lines Double Batang ACSR Conductor 300mm2.
Design, Supply and Construction of 132kV Loop In-Loop Out Transmission Line to Gelang Patah Substation.
Line Diversion Work with Includes Supply and Install and Auxillary Cross Arm.
To Design, Procure, Erect, Test and Commission 33kV Transmission Line from Petronas Gebeng Solar Installation to TNB PMU Gebeng Industry.
Line Diversion Work with Includes Supply and Install and Auxillary Cross Arm.
132kV Overhead Line (KULE-KLJT/BCVS) Loop-In / Loop-Out Into PMU MRT Jinjang.
Reconfigure with Included Design, Supply, Erect, Construction and Testing & Commissioning of Existing Double Circuit 275kV Transmission Line from PMU Gurun East to PMU Junjung.