A light of hope was brought to the lives of Orang Asli at Kampung Batu 23, Jalan Pahang, Tapah as the second phase installation of Renewable-Based Microgrid Solution is now completed. The second phase installation ended on 31 March 2021 which saw an additional four solar panels and a complete set of Hydrogen Self Recharging Fuel Cells (SRFC) Solution consisting two components; 1) Electrolyzer & Hydrogen Fuel Cell Cabinet and 2) 0.5m3 Hydrogen Gas Storage Vessel.
CHANGE IN REMUNERATION COMMITTEE

CHANGE IN NOMINATION COMMITTEE

CHANGE IN NOMINATION COMMITTEE

CHANGE IN AUDIT COMMITTEE

CHANGE IN AUDIT COMMITTEE

CHANGE IN BOARDROOM

PESTECH to Tap into Regional Economic Recovery

THE acceleration in the vaccine rollout has put the global economy in a revival mode. Usually, infrastructure development would be governments’ top priority in their efforts to revitalise the economy.
Source:
Back
Green Sustainable Ventures (Cambodia) Co., Ltd.
No. 06, St. 588, Sangkat Boeung Kok II, Khan Toul Kork, Phnom Penh, CAMBODIA.
ODM Power Line Company Limited
No. 6, Street 588, Boeng Kak Pir, Tuol Kouk, Phnom Penh, CAMBODIA.