Malakoff Berhad
Complete Upgrade of Existing GT HMI Hardware, inclusive of Supply, Design, Engineering, Installation, Testing and Commissioning.
Complete Upgrade of Existing GT HMI Hardware, inclusive of Supply, Design, Engineering, Installation, Testing and Commissioning.
Relocation of GE Gas Turbine GTM LM2500 from Melawa to Batu Sapi Power Plant.
Complete Supply, Engineering, Testing, Installation and Commissioning of New HMI System for Plant Control System, inclusive of Integration with Existing Unit Control System, Excitation System, Protection System and RTU System.
Repair Works for Damaged of Overhead Catenary System (OCS) Equipment Due to Derailment of KTMB Goods Train No.344 at Batu Gajah on 28.10.2016.
System Works Comprising (Design and Build):
Refurbishment Works for 11kV and 33kV CRP at PMU Tanjung Langsat, Johor.
Provide Electrical Installation Works at Tanjung Manis 2 132/33kV Substation Project.
The Supply, Installation, Testing & Commissioning of HT System Installation for Fornix Bukit Beruntung Factory.
PESTEC is committed in empowering the off-grid communities to improve their lives through renewable energy solutions. In our efforts to expand in this area, we have implemented the Renewable-Based Microgrid solution at Kampung Batu 23, Tapah.