PNG Power Ltd
Turnkey Project Consist of Design, Supply, Construction and Testing & Commissioning of Telecommunication Equipment include Fiber Optical Cables for 66kV Kila-Kila Substation, Papua New Guinea.
Turnkey Project Consist of Design, Supply, Construction and Testing & Commissioning of Telecommunication Equipment include Fiber Optical Cables for 66kV Kila-Kila Substation, Papua New Guinea.
Turnkey Contract with Inclusive of Design, Supply, Construct, Testing and Commissioning of Telecommunication System for 115/22kV Oddor Meanchey Substation and 230/22kV Bek Chan (Porsenchey) Substation Project, Cambodia.
Installation and Commissioning of Siemens 22kV GIS Switchgear for PMU Majidec including Civil Work Modification to Support the New Switchboard.
Installation and Commissioning of 22kV &11kV Switchgear & CRP for TNB Substations in the Southern Region, Including Laying of Multicore Cable.
Laying of Control Cable for Power Station, Power Equipment and Panel Boxes for 3 Factories.
Installation of Overhead Cables, Control Panel Boxes for 2 Factories.
Installation & Modification of ABB 33kV GIS Mobile Substation.
Installation & Commissioning of 33kV Gas Insulated Switchgear & 11kV Switchgear for TNB PPU Substation in Northern Region.
Design, Engineering, Supply, Manufacturing, Delivery, Installation of 132kV, 33kV, 11kV of Remote Control Panel & Protection Panel, NER and Laying Cable for PMU 132/33/11kV Bidor Substation, Perak.
Design, Engineering, Supply and Manufacture of 132kV Control Relay Protection Panels, NER, Outdoor Junction Box and Distribution Board for GIS Huntsman Tioxide Project, Kemaman, Terengganu.