Metix Malaysia Sdn Bhd

Submitted by oswebmaster on Fri, 04/24/2020 - 15:30

Turnkey Project Includes Engineering, Design, Install, Testing & Commissioning and Warranty of 132/33kV Substation at Sakura Ferroalloys Project, Samalaju Industrial Park, Sarawak, Malaysia.

Tenaga Poly Sdn Bhd

Submitted by oswebmaster on Fri, 04/24/2020 - 15:30

Project for the Upgrading of Existing 132/11kV Main Intake Substation (Mainhead A) and The Design, Supply, Delivery, Installation, Testing & Commissioning, Putting Into Operation and Maintenance for a Period of 24 Months of 132kV Switchgear, Associated Equipment and Systems for 132/11kV Ulu Kali Main Intake Substation at HS (D) 2043, PT 2079, Mukim Bentong, Daerah Bentong, Pahang Darul Makmur (Mainhead B), Malaysia.

Tenaga Poly Sdn Bhd

Submitted by oswebmaster on Fri, 04/24/2020 - 15:30

Project for the Upgrading of Existing 132/11kV Main Intake Substation (Mainhead A) and The Design, Supply, Delivery, Installation, Testing & Commissioning, Putting Into Operation and Maintenance for a Period of 24 Months of 132kV Switchgear, Associated Equipment and Systems for 132/11kV Ulu Kali Main Intake Substation at HS (D) 2043, PT 2079, Mukim Bentong, Daerah Bentong, Pahang Darul Makmur (Mainhead B), Malaysia.

JSC “Severelectro”

Submitted by oswebmaster on Fri, 04/24/2020 - 15:30

Design, Supply and Installation of 3 Substations for JSC “Severelectro” IDA-ESARIP-ICB-CW-2014-1 under Electricity Supply Accountability and Reliability Improvement Project (ESARIP) (Bishkek 110/35/6kV, Orto-Say 35/6-10kV and Sport 35/6- 10kV), Kyrgyzstan.

JSC “Severelectro”

Submitted by oswebmaster on Fri, 04/24/2020 - 15:30

Design, Supply and Installation of 3 Substations for JSC “Severelectro” IDA-ESARIP-ICB-CW-2014-1 under Electricity Supply Accountability and Reliability Improvement Project (ESARIP) (Bishkek 110/35/6kV, Orto-Say 35/6-10kV and Sport 35/6- 10kV), Kyrgyzstan.